Mainsail Clew Outhaul Attachment Line Length?
- PeteC
- First Officer
- Posts: 243
- Joined: Tue Mar 02, 2004 7:06 pm
- Sailboat: MacGregor 26X
- Location: Hampton, VA...2001 Mac 26X, Honda 50
Mainsail Clew Outhaul Attachment Line Length?
I just realized the outhaul line attaching the mainsail clew to the end of the boom is way too short to attach the reefed sail's clew.
This is the line shown in the pictures on page 16 and 17 of the Mac 26X manual.
What is the proper length of this line?
BTW, I will have a lot more questions coming as I learn to sail the 26X.
Thanks,
PeteC
This is the line shown in the pictures on page 16 and 17 of the Mac 26X manual.
What is the proper length of this line?
BTW, I will have a lot more questions coming as I learn to sail the 26X.
Thanks,
PeteC
- craiglaforce
- Captain
- Posts: 831
- Joined: Fri Jan 02, 2004 8:30 am
- Sailboat: MacGregor 26X
- Location: Houston, Tx
Just measure the distance from cleat to highest reef point clew, double it and add about 2 feet for good measure (allowance to go around the boom beneath the clew and tie or cleat both ends.
Mine is probably about 8 feet of line, for a new mainsail with 2 reef points.
This assumes you are not doing a more elaborate reefing setup.
Mine is probably about 8 feet of line, for a new mainsail with 2 reef points.
This assumes you are not doing a more elaborate reefing setup.
Outhaul
That outhaul / reef arangement is kind of messy. For about $25 bucks you can build a reefing system that makes the reefing thing a 10-20 second operation. All you need is a marine eye, a mast cheek block and a clamcleat and some screws. And about 16' of 1/4 staset.
Takes about 20 minutes to do the mod.
But I think 10' was the length of the original line. That made for a lot of extra line when not reefed to wrap around the end of the mast.
Takes about 20 minutes to do the mod.
But I think 10' was the length of the original line. That made for a lot of extra line when not reefed to wrap around the end of the mast.
-
Bill at BOATS 4 SAIL
- Admiral
- Posts: 1006
- Joined: Sat Jan 10, 2004 7:28 pm
- Sailboat: MacGregor 26D
- Location: Oconomowoc, WI
- PeteC
- First Officer
- Posts: 243
- Joined: Tue Mar 02, 2004 7:06 pm
- Sailboat: MacGregor 26X
- Location: Hampton, VA...2001 Mac 26X, Honda 50
Re: Outhaul
Bob,BobCardz wrote:That outhaul / reef arangement is kind of messy. For about $25 bucks you can build a reefing system that makes the reefing thing a 10-20 second operation. All you need is a marine eye, a mast cheek block and a clamcleat and some screws. And about 16' of 1/4 staset.
Takes about 20 minutes to do the mod.
But I think 10' was the length of the original line. That made for a lot of extra line when not reefed to wrap around the end of the mast.
Please give us more details. Perhaps a picture too.
Thanks,
PeteC
- Harry van der Meer
- First Officer
- Posts: 220
- Joined: Thu Feb 12, 2004 10:00 am
- Sailboat: MacGregor 26X
- Location: Warwick Neck, RI

