Nice.
Where are you planning on mounting it?
Places like this (please excuse the mess), or anywhere else it might be handy. I might play around with making a mounting face that will clamp to a stanchion or other non-flat surface.





Those are nice, but do they hold a wine glass?mac n cheese wrote: ↑Wed Dec 20, 2023 6:16 pm While on the topic of beverage holders I think found a perfect removeable one for the cockpit or cabin. Intended for use on
bed railings, arm rests, trolleys, rollators, wheelchairs or walkers...yeah...everything but boats but I find it ideal on the binnacle.
https://www.amazon.com/Pieces-Stroller- ... 285&sr=8-6
![]()
1. Done. I got the Dometic CFX3-45 from West Marine. They sent out one of those $100 off emails and I pulled the trigger. Total cost was about $750.C Buchs wrote: ↑Thu Nov 30, 2023 1:54 pm My list this year includes:
1. New 12V cooler. I bought the Mossimo one from Costco, but it died after 3 years. I'd like the Dometic, but $$
2. New standing rigging. I'm pretty sure mine is original. It looks OK, but ...
3. New lifelines. The plastic coating is all cracked.
Not too much this year![]()
Jeff
So what I actually got done..pitchpolehobie wrote: ↑Mon Nov 27, 2023 7:58 pmWinter can be a long time here in Ohio with a mix of good and bad weather. I have a heavy duty tarp on my boat that has access thru the stern so interior projects are doable.
Planning for a new motor well drain pipe
New rubrail around front hatch and companionway to cover the painted glass
Thinking of putting some vinyl thatch on the inside of the companionway hatch.
Add some washers to the cockpit ladder so it will swing up completely and stay up.
Make a roller furler support out of 4ft pvc pipe so I can leave it attached during the summer trips between destinations.
Early spring...
Pressure wash. Wax. Touch up barrier coat w rustoleum ablative.
What else do you have planned?
Be Free wrote: ↑Sun Dec 03, 2023 7:12 am Most of my winter projects are trailer related:
- Replace both front tires DONE
- Replace brakes on both axles DONE
- Service bearings DONE
- Rewire lights
- Replace some of the bunk supports
- Possibly replace springs and hangers Upgraded to "Definitely"
Once that is done I still have some wiring and cabinetry to do in the cabin.
- Make up a new fuel line DONE