Getting close to pulling the trigger on a new Spinnaker from Hyde Sails (.75 oz FiberMax 44 -- 312 sq ft). But have some questions I am hoping some of you with Spinnakers can answer:
will attach a new hound 18" above the current hound.
1) What type/size of block for the halyard is recommended?
2) How do you attach the block to the hound? (just a shackle?)
3) What size line for the halyard? (not planning to use the sock at this time...will launch from a bag)
Halyard will be run through a couple of turning blocks back to the cockpit and secured on a horn cleat.
Tack line will be run back to the cockpit through a couple of fairleads on the starboard side.
4) What type/size of block for the tack line?
5) How do you attach the tack line block? To the anchor roller? To the pulpit (can it take the stress)?
6) What size line for the tack line?
Will go with seperate sheet for each side...each about 50' long to allow for lazy sheet to be run forward of furled genoa and then back to cockpit.
7) What type of blocks for the sheet back in the cockpit?
9) Could I use my current track mounted genoa cam cleats?
10) Recommended line type/size for sheets? (Is 1/4" too small...want to keep the sheets low weight)
Trying to get a feel for how much hardware I will need and how much all this hardware and line will cost.
Thanks,
Jim


